24/7 FSE Hotline +1-800-GETINGE [email protected] EN | ES | FR-CA

Installed-base capability

Getinge Capability: Compare Fleet Operating Deltas Before Capital Approval

Legacy fleet lens

Older sterilizers / monitors

12-year average age · higher cycle energy · longer MTTR risk · incomplete cybersecurity documentation package

Current-generation lens

Getinge planning baseline

Current IFU set · clearer UDI and service logs · energy and CO2 planning inputs · interface ownership defined

Figures on this page are planning estimators. Final energy, CO2, uptime, and cost outcomes depend on load definition, utility rates, staffing, water quality, network ownership, and the selected product references.

Interactive planning calculator

Estimate Your Hospital or Clinic Planning Delta

Adjust bed count, device count, and fleet age to generate a discussion-range operating delta. This is not a quotation or a guaranteed savings claim.

$8,400/yr planning delta · 22 t CO2 planning delta / yr

Capability case lenses

Three Care Settings, Three Acceptance Tests

250-bed hospital SPD

Background: aging washer-sterilizer pairs create uneven tray release. Process: map cycle parameters, BI release, water quality, and FSE coverage. Result: a planning delta used in capital committee packets, not a performance guarantee.

14-OR ambulatory surgery center

Background: turnover pressure collides with limited sterile storage. Process: compare tabletop vs floor sterilizer capacity, packaging, and on-call service. Result: an ASC-specific acceptance checklist tied to procedure mix.

140-bed long-term care + remote monitoring

Background: bedside and remote monitors age unevenly across units. Process: inventory battery runtime, alarm fatigue controls, HL7 FHIR ownership, and support hours. Result: a phased replacement plan with documentation owners named.

Turn the estimate into an audit

Run the Capability Audit on Your Installed Base

Share asset families, age bands, utility constraints, care settings, and destination markets. No protected health information is required for the first review.

  • Energy and CO2 planning inputs
  • Service and parts readiness
  • Reference-specific document gaps
Please enter your name.
Please enter a work email.